BARN FIRE

February 7 – Engine and Squad Company was alerted at 4:02 PM to 4018 Altenwald Road for a possible barn fire (Mont Alto’s First Due).  Chief 2 (Command 5) arrived within minutes to find a working horse barn fire.  Engine 7-2 which was 3rd due engine arrived as second engine on the scene and was assigned as fire attack.  Squad 7 arrived a short time later and was placed in manpower staging.  Crews were on the scene for around 1 hour before being released.